  Hobart Arena 2016 Renovation
Primary Areas Being Addressed in Design
 
     
 

1.       Restrooms:

Currently the facility falls far short on the number of fixtures it should have.

Current fixture count:                                   17 Mens

                                                                                13 Womens

Proposed fixture count:                               47 Mens

                                                                                47 Womens

                               

2.        Kitchen & Concessions & Related Equipment:

Currently:          

·         1 food concession stand with 3 points of sale

·         1 kitchen with no prepping capabilities

·         2 stands that are used for beer concessions

                                                Proposed:

·         5 concession stands evenly spaced throughout the facility & ability to sell food and beverage from same points of sale totaling 17 points of sale

·         Capability to offer wider variety and higher quality food and beverage selections

·         A fully operational kitchen to service the concession stands and the ability to accommodate caterers to service the building including the multi- purpose room

 

3.        Multipurpose Room

Currently:

·         An area is converted into a catering room and it is not located back of house for special events.  It is very difficult for caterers to service this area, especially with no kitchen facilities.

Proposed:

·         Multi-purpose room will be located back of house and will be serviced by a kitchen which will be located adjacent to it.

·         This space will be able to accommodate up to 220 people.

·         This space will provide the facility the ability for event rentals including business luncheons/trainings, social events, etc..

 

4.        Dressing Rooms/Locker Rooms

Currently:

·         4 total - 2 are located in the public corridor

Proposed:

·         All 4 located back of house

·         All 4 will be able to be used during events for performers

·         Directly accessible to the multipurpose room and production areas

 

5.       South Entrance

·         Proposed addresses several needs:

o   Provide a 2nd lobby & larger lobby in addition to the existing lobby.

o   Box offices with exterior and interior windows.

o   A customer service desk area to take care of daily customer needs and patrons during events (registration, shelter reservations, lost & found, customer service, information, etc.)

o   Concession stand that can potentially  be open daily during facility hours

o   Party room to meet demands during public skating events and also serve as an “in service” meeting area on event days for event staff.

 

6.        Some Other Misc. Capital Improvement items included in the project:

·         Scoreboards replaced and upgraded

·         Roof/wall/exterior repairs

·         Corridor Flooring replaced

·         Lighting replaced 

·         Rigging Steel Improvements for shows

·         Condensor/Receiver components of the refrigeration system replaced

·         Domestic water piping replaced

·         Water Heaters replaced

 

Overall Square Footage

Current:  51,000

Proposed Additional:  26,000

 
     
 
Troy Community Television View Renovations Updates Compliments of Troy Community Television:
   Play Youtube Video of Hobart Arena in Troy, Ohio
February 2017 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio January 2017 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio December 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio November 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio October 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio September 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio August 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio July 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio June 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio May 2016 - Hobart Arena Renovation Update
   Play Youtube Video of Hobart Arena in Troy, Ohio April 2016 - Hobart Arena Renovation Update
 
     

 
Home | Contact Us | Directions | Parking | Seating | Arena Specs | Arena Legacy | Program Registration | Event Calendar | Arena Partners
 
Troy Ohio USA
Hobart Arena
| 255 Adams Street | Troy, Ohio 45373 | phone (937) 339-2911 | fax (937) 335-0046


ALL RIGHTS RESERVED.
Follow Hobart Arena on Facebook